A new water main was to be laid across equine training gallops. The grass needed to be lifted and replaced with minimal interruption to the horses’ training programmes.

The turf was managed prior to cutting to ensure it was in good condition before it was lifted with a turf cutter that had been specifically built for the job. The machine ensured that the turf was lifted with a thick layer of soil that contained a good root mass to aid re-establishment.

This project demonstrated the levels and attention to detail that our team will employ to get a job completed to the required standard. This level of detail resulted in the gallops being operational as soon after the work was completed.

Other projects

Comprehensive grounds maintenance at ICR’s Sutton site

Comprehensive grounds maintenance at ICR’s Sutton site

Tree works at the White Cliffs of Dover

Tree works at the White Cliffs of Dover

East West Rail Alliance

East West Rail Alliance

Plastic-free planting treeline reinstatement

Plastic-free planting treeline reinstatement

Tree and hedge planting for Belectric solar farm

Tree and hedge planting for Belectric solar farm

Enhancing habitat diversity with hibernacula

Enhancing habitat diversity with hibernacula